top of page

Retail and Banking

Salem Five Cent Savings Bank

Multiple Locations

Middleton, MA - The 4,000 square foot branch is located in a new residential-style strip mall in Middleton.  Every element of the eight-week project was coordinated with the base building, simultaneously under construction. The project included a new teller line, check writing table, conference room, kitchen, office space, millwork and glass throughout. The branch was completed on schedule and opened in August 2006.

 

Hamilton, MA - Located in historic Hamilton, renovations to the 3,500 square foot Hamilton branch occurred in two phases. Throughout construction, the bank remained occupied and fully operational. Each phase was completed in three weeks and required a weekend change-over. Phase One consisted of demolition and installation of new millwork, glass throughout and a new teller line. To ensure the bank was one hundred percent operational, Commodore installed a temporary teller line while construction of the permanent teller line was underway. Phase Two commenced immediately following completion of Phase One. The temporary teller line was removed and the build-out of the new offices, kitchen and conference space then took place. New floor underlayment was installed throughout and special floor reinforcement was added underneath the new vault.

 

North, Beverly, MA - This project included a new millwork teller line, a check writing table, conference rooms, a kitchen and offices. This project was completed in an 8-week schedule.

 

Salem, MA - Complete architectural & mechanical renovations to 10,000 sf corporate and commercial lending space in downtown Salem. Work included demolition, drywall, carpeting, millwork, wood floors and MEP improvements as well bathroom and core/shell upgrades. Project was completed on schedule in eight weeks.

 

Please reload

CB Richard Ellis Management Office

100 Cambridge Street, Boston

A 1500 sf fit-out for the building management personnel at 100 Cambridge Street. This project was a small fit-out that was completed in four weeks time. Commodore self-performed the drywall work under the supervision of our working superintendent.

 

Metro Meeting Center

Boston, MA

The Metro Meeting Center project is a full floor fit-out of the 4th floor of 101 Federal Street.  The new space is a 19,500 sf conference center that consists of several meeting/conference rooms and a kitchen/dining area.  The renovation work took place in an occupied office building. Finishes included carpet, millwork, glass wall tile, motorized window shades and an operable wall system.

 

The project was built in 10 weeks and is valued at approx. $735,000.

EZ Storage Facility

145 N. Beacon Street, Brighton, MA

This ground up project consists of new footings, slab on grade and masonry bearing walls to create a new two-story, 180,000 sf self storage facility. The new facility includes a showroom and apartment for an on site staff person. The construction is steel structure with light gage panel wall system. Other significant work includes a drive thru for tractor trailers and all new MEP and fire protection systems.

 

 